Tiroler Wasserkraft Arena, Innsbruck
Construction:
Tiroler Wasserkraft Arena, Innsbruck
Year of construction:
2004
Client:
Ing. Hans Bodner Bauges.m.b.H. & Co KG, Kufstein
Site manager:
Ing. Hans Bodner Bauges.m.b.H. & Co KG
Ing. Kirchner, Tel. +43 53 72 - 6 99 90
Ing. Kirchner, Tel. +43 53 72 - 6 99 90
Execution:
3200 m² isolation
1600 m² Wooden spacers as substructure
3200 m² panels 65/400/1,00 mm aluminium, embossed
200 m eaves gutter inside
220 m eaves gutter outside
210 m cornice covering
700 m snow guard
1600 m² Wooden spacers as substructure
3200 m² panels 65/400/1,00 mm aluminium, embossed
200 m eaves gutter inside
220 m eaves gutter outside
210 m cornice covering
700 m snow guard




back