Maho AG Kempten
Construction projects:
Maho AG Kempten
Year of construction:
1992
Client:
Machine factory Kempten
Architect:
Engineering consultancy Ulrich Kleine, Trier
Design:
4000 sqm double layer wall cladding consisting of modular steel internal facade, insulation, and aluminium outer façade
12,000 sqm double layer metal roof consisting of trapezoidal steel sheet, vapour barrier, insulation, and Kal-Zip roof as roof skin.
12,000 sqm double layer metal roof consisting of trapezoidal steel sheet, vapour barrier, insulation, and Kal-Zip roof as roof skin.




back